Public or private
Map the work against the right of way before assuming one permit path applies.
Concrete services
Plan new and replacement concrete sidewalks in Bismarck, ND, with drainage, accessibility, walkways, and right-of-way coordination.

A private garden walk and a public sidewalk are not the same permitting project. Start by identifying the property boundary, right of way, curb connection, driveway crossing, route function, and any accessibility concern.
If the project reaches a public sidewalk, curb ramp, driveway apron, curb, gutter, boulevard, or street access, contact the city early. Bismarck publishes an approved-contractor list for applicable right-of-way work.
For private walks, evaluate movement, drainage, roots, adjacent steps, trip points, accessibility goals, and whether isolated or broader replacement makes sense.
Map the work against the right of way before assuming one permit path applies.
Width, direction changes, steps, gates, doors, and mobility needs affect the layout.
Downspouts, low areas, soil movement, and nearby roots can contribute to recurring problems.
Driveways, aprons, patios, steps, and curb ramps may need coordinated elevations and approvals.
Scope conversation
A visible texture commonly considered for walking surfaces and practical traction.
Stamped or bordered private walks can be considered when the finish fits the site and maintenance plan.
City details and approved plans control the work. Decorative preferences cannot override municipal requirements.
Permits and jurisdiction
Bismarck states that concrete work within the public right of way must be performed by a City-approved contractor. Mandan also requires a right-of-way permit and a licensed and bonded contractor for applicable concrete work. Private-property work follows a different path. Verify the current rule with the city before contracting.
Read the permit guideAfter finishing
We provide guidance for protection, pedestrian reopening, winter exposure, and maintenance. Public work can also have inspection or barricade requirements that affect the handoff.
Complete project information reduces avoidable follow-up and helps us review the scope accurately.
No. The City says work within the public right of way must be completed by a contractor on its approved list. Confirm the contractor's current status and permit process directly with Public Works.
Not automatically. Work entirely on private property is distinct from right-of-way work. Other codes or project features can still apply, so verify the site and scope.
Sometimes, but adjacent movement, roots, drainage, elevation transitions, and municipal requirements should be assessed before defining the scope.
Plan the next conversation
A complete request helps us understand the scope, access, finish, drainage, and timing.